M00005889
New product
DESIGN, FABRICATION, OPERATIONAL EFFECTS, INSPECTION, ASSESSMENT, AND REPAIR OF COKE DRUMS AND PERIPHERAL COMPONENTS IN DELAYED COKING UNITS
American Petroleum Institute
In stock
Warning: Last items in stock!
Availability date: 10/27/2021
1 Scope
2 Normative References
3 Terms, Definitions, and Acronyms
4 Background
5 Design
6 Fabrication
7 Effects of Operating Practices on Drum Reliability
8 Inspection and Monitoring
9 Condition Assessment
10 Repairs
11 Peripheral Equipment
Bibliography
Provides information and guidance on the practices used by industry practitioners on the design, fabrication, operation, inspection, assessment and repair of coke drums and peripheral components in delayed coking units.
Published | |
Document Type | Standard |
Status | Current |
Publisher | American Petroleum Institute |
Pages | |
ISBN |