M00006132
New product
RECOMMENDED PRACTICE FOR CONSTRUCTION PARALLEL TO EXISTING UNDERGROUND TRANSMISSION PIPELINES
American Petroleum Institute
In stock
Warning: Last items in stock!
Availability date: 10/27/2021
1 Scope
2 Normative References
3 Terms, Definitions, Acronyms, and Abbreviations
4 Parallel Construction Excavation Damage Prevention
Guidelines
5 Preliminary Design
6 Final Design
7 Preconstruction Activities
8 Construction Activities
9 Post-construction Activities
Annex A (informative) - Planning and Design Review
Meeting(s) Agenda
Annex B (informative) - Post-construction Review and
Lessons Learned Meeting Agenda
Acts as a resource to assist all parties to safely manage construction activities of new or modified facilities parallel to existing underground transmission pipelines.
Published | |
Document Type | Standard |
Status | Current |
Publisher | American Petroleum Institute |
Pages | |
ISBN |