M00021282
New product
WIND TURBINES - PART 26-2: PRODUCTION-BASED AVAILABILITY FOR WIND TURBINES (IEC/TS 61400-26-2:2014)
British Standards Institution
In stock
Warning: Last items in stock!
Availability date: 11/05/2021
FOREWORD<br>INTRODUCTION<br>1 Scope<br>2 Normative references<br>3 Terms, definitions and abbreviations<br>4 Information model<br>Annex A (informative) - Possible methods for the<br> determination of potential energy production<br>Annex B (informative) - Production-based<br> availability indicators - examples<br>Annex C (informative) - Capacity factor and other<br> performance indicators<br>Annex D (informative) - Verification scenarios - examples<br>Annex E (informative) - Considerations of competing<br> assignment of lost production<br>Bibliography<br>Annex ZA (normative) - Normative references to<br> international publications with their<br> corresponding European publications
Defines a framework from which production-based performance indicators of a WTGS (wind turbine generator system) can be derived.
Published | |
Document Type | Standard |
Status | Current |
Publisher | British Standards Institution |
Pages | |
ISBN | |
Committee | PEL/88 |
Supersedes |
|